Get all your news in one place.
100’s of premium titles.
One app.
Start reading
Glasgow Live
Glasgow Live
National
Drew Sandelands

Glasgow's fourth Gaelic primary moves closer with plan to revamp former East End school

Glasgow’s fourth Gaelic primary has moved a step closer as plans to redevelop a run-down former East End school have been submitted.

The city council’s education department has requested permission to demolish part of the B-listed St James’ Primary, Calton, to make way for the new school. Toilet extensions and a section to the rear of the school building would be knocked down to allow an extension, including a hall, kitchen and drama space, to be constructed.

An all-weather sports pitch is also included in the overall plan for the site.

READ MORE: Fourth Gaelic primary school to be built in Glasgow

The plans state: “When the need for another Gaelic school was identified in the north east of the city, St James’ Primary was recognised as fulfilling a number of the education requirements, whilst also contributing to the local area by saving a heritage asset in the Calton area.”

It has previously been reported by council officials that the project will cost around £16m. Glasgow’s education services have now applied for listed building consent for internal and external works and partial demolition at the Calton site.

Emergency works have previously been carried out to the roof to “avoid uncontrolled collapse and halt further distress to the building”, the application revealed. The Green Street school, constructed in 1885 to the plans of architectural firm Thomson & Sandilands, was occupied until 2009, when remaining pupils were transferred to Alexandra Parade Primary.

Since the closure, the building has “rapidly deteriorated” and is “completely saturated” as it was “left exposed to the elements” when lead was stripped from the gutters. The redeveloped building would be Glasgow’s fourth Gaelic medium primary school, joining Glendale Primary, Govan Gaelic Primary and Glasgow Gaelic School.

Extending the back of the school has been deemed “most appropriate”, the application states, with the new-build providing “required spaces for a modern school building that the original building can’t accommodate”.

“This would mean the function of the original classrooms would be retained and also reinstated where previously a kitchen and lunch hall were accommodated,” the plans added.

“Extending to the rear also retains the most architecturally significant elements of the building on the front facade but would require the demolition of the projecting canted bay and the later toilet blocks.”

The suggested justification for demolition added the “rear canted bay and the circulation wings were treated as subsidiary to the main building and as a result the architectural finishes to the stonework were less refined”. All existing single glazed windows would be removed and replaced with triple glazing which follows “the principles” of the original design but meets current ventilation and energy requirements.

RSPB Scotland has asked the council to provide swift nest sites in the building as nests “are being lost when buildings are demolished or roofs refurbished”.

“Loss of nest sites is a key driver behind the dramatic decline of swifts,” the submission added.

READ NEXT

- Eurovision 2023: Glasgow named bookies' favourite to host next year's event

- Renfrew family set up drugs business when their flooring firm went bust

- Glasgow woman diagnosed with brain tumour after collapsing in garage forecourt

- Deaths of three babies to be investigated in Lanarkshire after families suffer 'terrible losses'

- Glasgow drug deaths at a record high as new figures published

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.