Get all your news in one place.
100’s of premium titles.
One app.
Start reading
The Hindu
The Hindu
National
Staff Reporter

Feasibility study for two RoBs soon in Guntur

A feasibility study will be done after a week for the construction of a road over-bridge at Arundelpeta and Gaddipadu and a low-height subway at Syamala Nagar, said Regional Officer, NHAI, Sravan Kumar Singh.

Mr. Singh along with Municipal Commissioner Nishant Kumar inspected three areas and expressed the opinion that there was a requirement of two ROBs and an LHS at Syamala Nagar.

MLC Lella Appireddy also joined them at Syamala Nagar.

The GMC proposed that two new RoBs should be built at Gaddipadu on the inner ring road phase 1 and at Arundelpeta where the park dishing bridge built in 1958 is too narrow for the growing traffic.

The LHS at Syamala Nagar would ease traffic congestion as the traffic from Nallpadu has increased considerably.

Sign up to read this article
Read news from 100’s of titles, curated specifically for you.
Already a member? Sign in here
Related Stories
Top stories on inkl right now
One subscription that gives you access to news from hundreds of sites
Already a member? Sign in here
Our Picks
Fourteen days free
Download the app
One app. One membership.
100+ trusted global sources.