The Chesapeake 1,000, a powerful crane capable of lifting approximately 1,000 tons, faces a significant challenge in the form of a section of the Francis Scott Key Bridge weighing between 3,000 to 4,000 tons, as revealed by Maryland Gov. Wes Moore on Friday.
To overcome this obstacle, the team responsible for the operation must carefully dismantle the truss into manageable sections. This process must be executed with a strong emphasis on safety, responsibility, and efficiency to ensure the successful removal of the bridge section from the water.